PALOS VERDES RECYCLED WATER PUMP STATION

PROJECT: 

Palos Verdes Recycled Water Pump Station.

.​

LOCATION: 

3920 W 235TH ST. TORRANCE, CA 90505.

 

OWNER: 

West Basin Municipal Water District.

​

WORK DESCRIPTION: 

Construction of a building of approximately 785 square feet with an A-frame roof to house a booster pump station consisting of skid mounted centrifugal pumps, including three (3) pumps at 500 gallons per minute (gpm), and two (2) pumps at 28 gpm, all on variable frequency drives (VFDs); a 750-gallon bladder surge tank; connection to existing recycled water system and any required removal of flanges on existing recycled water system; monorail; electrical equipment including transformer, switchboard, motor control center (MCCs); building mechanical; structural and architectural components; site fencing, new parking spots; application of slurry seal on parking area; drainage facilities; educational exhibits, including all other appurtenances.

 

PROJECT COMPLETION DATE: 

September 2025.

​

IMAGE GALLERY: â€‹â€‹â€‹â€‹

​​​​​​

​

IMG_6283 2.JPG
IMG_6102.JPG
IMG_6121.JPG
IMG_6368.JPG
IMG_6432.JPG
IMG_6462.JPG
IMG_6097.JPG
IMG_5823.JPG
IMG_5987 2.JPG
IMG_5979.JPG
IMG_5795.JPG
IMG_5829.JPG
IMG_5693.JPG
IMG_5965.JPG
IMG_6848.JPG

© 2022 by Amali Engineering Contractors, Inc. All rights reserved.

  • Facebook
  • Linkedin
bottom of page